Laguna Niguel, California

Two-bathroom condominium remodel

Two coordinated bathroom renovations transformed a quiet condominium near the coast, giving each room its own material identity while connecting the project through a restrained palette and warm metal accents.

Completed Laguna Niguel bathroom with patterned tile, navy cabinetry, brass-tone fixtures, and glass enclosure
PropertyCondominium near the coast
ProjectTwo-bathroom remodel
Area154 sq. ft. total
CompletedJuly 2026

Project overview

One coordinated remodel, two distinct rooms.

The remodel addressed two existing bathrooms within the same condominium. Across 54-square-foot and 100-square-foot rooms, the project introduced new wet-area finishes, cabinetry, counters, lighting, mirrors, plumbing fixtures, and glass enclosures.

The design language connects the rooms through a restrained palette and warm metal accents. Individual tile patterns, cabinetry, and shower configurations respond to each room's layout.

Bathroom One · 54 sq. ft.

A clearer focal point for a narrow room.

Navy cabinetry, a light countertop, blue-and-white patterned tile, updated lighting, a decorative mirror, brass-tone fixtures, and a glass tub enclosure bring the room together while preserving a practical layout.

Bathroom One before remodeling
Before
Bathroom One after remodeling with navy cabinetry and patterned tile
After
Bathroom One waterproofing and tile preparation during construction

Construction details

Preparation behind the finished surface.

Construction photographs document wet-area preparation, waterproofing, built-in niches, tile layout, and the transition from substrate work to finished surfaces. These details support the clean appearance of the final installation.

Bathroom Two · 100 sq. ft.

A rebuilt shower with a more open character.

The former corner shower was rebuilt with herringbone wall tile, a pebble shower floor, frameless glass, dark cabinetry, a light countertop, and brass-tone fixtures. The updated layout feels brighter, more open, and easier to use.

Bathroom Two before remodeling
Before
Bathroom Two after remodeling with herringbone tile, pebble floor, and frameless glass
After
Bathroom Two shower preparation during construction

Field documentation

Wet-area work recorded before closeout.

The construction record shows the shower preparation and enclosure work before tile, fixtures, and frameless glass completed the room.

The result

Coordinated spaces with distinct identities.

Completed in July 2026, the two-bathroom remodel gives the condominium a coordinated pair of updated spaces with improved function, stronger visual identity, and durable finish selections suited to everyday use.

Plan your remodel
Back to portfolio